This is a photo of our Chadian team that was used in the power plant job.
Pipes that we fabricated and installed in Chad.
More pipes that were prefabricated by us and then installed.
Another picture of the pipe part of the job in Chad.
Pipes that were fabricated at the shop and then assembled in the field.
Pipe spool used on the power plant job.
Another pipe spool used on the power plant job.
Picture of the power plant job site in Chad.
Assembly of a 24" pipeline in Chad.
One of our welders welding parts on the Chad job.
Welding up the pipeline in Chad.
Close up of a TiG welding head made for a very tight space.